Home Building Checklist: What You Need Each Step
Building: It’s fun to build a new house, but it can be hard to keep track of everything. It’s a lot of work to keep track of things like who to hire, when to hire them, deadlines, permits, inspections, and more. Hence, our home-making checklist was created to make the process easier.
We’ll show you how to build a house within this piece. Making building a house easier to handle is done by including simple jobs on a checklist for each step. This making a house checklist should help you feel less stressed and more prepared.
Buy Materials
Usually, general contractors are in charge of getting the building items they need. They often already have connections with different sources of materials, so they can get better deals. However, if a potential homeowner wants to buy their building materials like 5 Gallon Plastic Pail, the process is pretty easy.
Just get price quotes from a few local supply companies for the items you need and then compare their prices. Your building plans and some math can help you figure out how much stuff you will need.
Purchase builder’s risk insurance before the supplies start coming in. During development, this insurance protects buildings from things like fire, hail, theft, and vandalism. It lets people get paid for things that are stolen or damaged.
Prepare the Site and Lay the Foundation
Getting all the necessary permits, like a removal permit, is the next step. Work can’t start until the right permits are obtained.
Once the building permits are in order, the first thing that needs to be done is to prepare the spot ground. For starters, buildings that aren’t needed can be taken down.
Grading will level the ground so that the foundation of the house can sit on it, and it will also make drainage slopes away from the land to stop water damage in the future. As soon as the ground is level, the base can be poured. After the base is poured, it should be inspected to make sure there aren’t any problems.
Frame the Build
If the base is level and square, framing can start. Right here is where the house starts to come to life! The structure of the house is started by subcontractors framing the subfloor, walls, and dividers for each story.
Later, workers will add wall sheathing to keep walls from bowing or swaying and to keep water out. Additionally, the siding will be attached to this base at some point.
For the home’s structural stability, the build must pass a framing inspection once the framing is done. After passing the check, workers can start putting in the doors and windows.
- Planning Phase:
- Budget allocation and financial planning.
- Selecting a suitable location.
- Finding an architect or designer.
- Securing necessary permits and approvals.
- Design Phase:
- Finalizing architectural plans.
- Choosing building materials.
- Selecting interior finishes and fixtures.
- Obtaining quotes from contractors.
- Pre-Construction Phase:
- Hiring a reputable contractor.
- Signing contracts and agreements.
- Scheduling demolition or site preparation.
- Ensuring utilities are connected or scheduled for connection.
- Construction Phase:
- Clear communication with the contractor.
- Regular site visits to monitor progress.
- Addressing any issues or changes promptly.
- Inspecting workmanship and quality.
- Interior Finishing Phase:
- Installing plumbing and electrical systems.
- Completing insulation and drywall.
- Flooring installation.
- Cabinetry and countertop installation.
- Exterior Finishing Phase:
- Installing exterior siding and trim.
- Roofing installation.
- Landscaping and outdoor features.
- Final exterior inspections and touch-ups.
- Final Touches and Inspections:
- Painting and final interior touches.
- Installation of appliances and fixtures.
- Final walkthrough with the contractor.
- Obtaining occupancy permits and certifications.
- Moving In:
- Packing and coordinating the move.
- Setting up utilities and services.
- Unpacking and settling into the new home.
- Celebrating the completion of your dream home!
Install Plumbing, Electrical, and HVAC (Building)
The first thing that needs to be done when working on the inside of a house is adding basic systems like plumbing, electricity, and HVAC (heating, ventilation, and air conditioning). Workers will run water and sewer lines, wire the house, and put in fans.
People who bought bathtubs or other big plumbing items should have them fixed now. This is also the step where any special wiring, like for a video system, is put in.
Homeowners should take floor plans to the power company to find out what size heating and cooling system, and fire protection equipment they need before they install it. It is better to have smaller processes. If you are making a bigger house, you might want to put in several smaller systems instead of one big one.